Sunday, July 20, 2014

Roof and walls


What the original W dormer looked like.


Valleys need work.


Shingles, tar paper, shingles - slate.  Original dormer copper roof.

Note the string line (bowed 13")


Original ridge beam




Original valley boards.  (Superglue didn't work here)

New 40' ridge beam


 Oops!  Knocked the wall down...






New W. Dormer (and roof)

Lowering the fire escape stairs.  July 19


Redesigning the front of the roof.

Relaying the internal mason wall.



Inside, 2nd fllor coming along


Putting in the back wall


No comments:

Post a Comment