Sunday, July 20, 2014
Roof and walls
What the original W dormer looked like.
Valleys need work.
Shingles, tar paper, shingles - slate. Original dormer copper roof.
Note the string line (bowed 13")
Original ridge beam
Original valley boards. (Superglue didn't work here)
New 40' ridge beam
Oops! Knocked the wall down...
New W. Dormer (and roof)
Lowering the fire escape stairs. July 19
Redesigning the front of the roof.
Relaying the internal mason wall.
Inside, 2nd fllor coming along
Putting in the back wall